| 简体中文 | English
  • Home
  • Company
    • Company Profile
    • Organizational Structure
    • Company Management
    • Corporate Culture
    • Qualification certificates
    • Business Distribution
    • Customer Base
    • Company Milestones
  • Overseas Projects
    • FT Turkmenistan
      • Turkmenistan-company profile
      • Turkmenistan-operation teams
      • Turkmenistan-honors
    • FT Argentina
      • Argentina-company profile
      • Argentina-operation teams
      • Argentina-honors
    • FT Thailand
      • Thailand-company profile
      • Thailand-operation teams
      • Thailand-honors
    • FT Venezuela
      • Venezuela-company profile
      • Venezuela-operation teams
      • Venezuela-honors
    • FT Iraq
      • Iraq-company profile
    • FT china
      • china-company profile
    • FT Iran
      • Iran-company profile
      • Iran-operation teams
  • News Center
    • Company News
    • Industry Trends
    • Cultural Activity
  • Scope Work
    • Well drilling
      • Vertical drilling technology
      • Directional well and horizontal well drilling
      • High temperature and high pressure drilling technology
      • Casing window sidetracking technology
      • Air drilling and foam drilling technologies
      • Underbalanced drilling
      • Controlled pressure drilling
    • Well workover
    • Artifical Lift
    • Oil bailing
    • Wellbore technical services
      • Well completion
      • Wire Logging
      • Drilling fluid services
      • Cementing services
      • Top drive casing running services
      • Solid control service
      • Deflection fracturing technology
      • Deflection fracturing technology
      • Coring technical services
    • More Tech-service
      • Cuttings disposal
      • Wear-resistant belt soldering
  • Commerce
    • Product
      • Tubing & casing
      • Line Pipes
      • Drilling Tools
      • Drilling and Workover Machines
    • Consulting
    • Crude Oil
    • HR Services
    • Invmt Cooperation
      • warehousing
      • brand strategy alliance
      • Crossover Operations
  • Production
    • Turkmenistan item
      • FT-306
      • FT-308
      • FT-cementing
    • Argentina item
      • FT-303
      • FT-307
      • FT-311
      • FT-312
      • FT-313
      • FT-315
      • FT-318
      • FT-316
    • Thailand item
      • FT-310
      • FT-317
    • Venezuela item
      • FT-309
    • Iran item
      • FT-305
      • FT-319
  • QHSE
    • QHSE System
    • Quality Control
    • QHSE achievements
    • HSE
  • HR
    • Talent Concept
    • Staff Training
    • Staff development
    • Recruitment
  • Contact Us
  • The company is committed to providing per diem contractual onshore drilling and workover engineering services while striving to expand the relevant service markets.
  • The company is committed to providing per diem contractual onshore drilling and workover engineering services while striving to expand the relevant service markets.
  • The company is committed to providing per diem contractual onshore drilling and workover engineering services while striving to expand the relevant service markets.
  • The company is committed to providing per diem contractual onshore drilling and workover engineering services while striving to expand the relevant service markets.
  • The company is committed to providing per diem contractual onshore drilling and workover engineering services while striving to expand the relevant service markets.
  • The company is committed to providing per diem contractual onshore drilling and workover engineering services while striving to expand the relevant service markets.
News & Events
Company News
Industry Trends
Cultural Activity
present:home > News & Events > Company News
  • 2009-10-20 FT-306:KOR Oil Field
  • 2009-10-20 FT-306:KAM Oil Field
  • 2009-10-28 RIH dual tubing job successfully in Argentina, increased oil production a lot
  • 2009-07-11 FT-323 Rig (20C) Spud-in For Its First Well in Turkmenistan on August 4,2009.
  • 2009-07-11 FT-308 Rig (30C) Spud-in For Its First Well in Turkmenistan on July 24,2009.
  • 2009-07-11 Workover job performs well in Argentina
  • 2009-05-29 Everything is OK
  • 2009-05-13 Rig assembly of ZJ70D has completed in Zhongcheng Assembly Base of our company
  • 2009-05-11 Iran, OPEC’s oil revenue among the forefront of Rise of Iran
  • 2009-04-30 Emphasize training and an atmosphere of study in the company
第3页/共4页 共33条 上一页 [1] [2] [3] [4] 下一页 
www.fieldtechgroup.com All Rights Reserved 菲尔泰克石油技术服务有限公司版权所有 home | join us | contact us | Email